Chapter 5 Project Processes
Understand how project processes are used to establish and evolve project plans, to execute the project plans, to assess actual achievement and progress against the plans and to control execution of the project through to fulfillment
40  cards
Chapter 4.5 Integration
The purpose of the integration process is to assemble a system that is consistent with the architectural design.
8  cards
Chapter 4.6 Verification
Confirm that the specified design requirements are fulfilled by the system
7  cards
Chapter 4.7 Transition
Establish a capability to provide services specified by stakeholder requirements in the operational environment
7  cards
Chapter 4.8 Validation
Provide objective evidence the services provided comply with the stakeholders requirements in its intended operational environment
8  cards
4.9 Operation
Use the system in order to deliver its services
5  cards
4.10 Maintenance
Sustain the capability of the system to provide a service
8  cards
4.11 Disposal
End the existence of a system entity
8  cards
Chapter 5.1 Systems Engineering Plan
Define how the project's technical effort will be organized, structured, conducted and controlled.
10  cards
Chapter 5.1 Integrated Product and Process Development
Show how the IPPD 1. Reduces time to market 2. Improves product quality 3. Reduces waste 4. Saves costs through complete integration of SE life-cycle processes
13  cards
Chapter 5 Decision Management
The purpose for decision management is select the most beneficial course of project action where alternatives exist
18  cards
Chapter 5.4 Risk Management
Identify, analyze treat and monitor the risks continuously.
18  cards
Chapter 5.5 Configuration Management
Establish and maintain the integrity of all identified outputs of a project or process and make them available to concerned parties
30  cards
Chapter 5.6 Information Management Process
Provide relevant, timely, complete, valid and, if required, confidential information to designated parties during and, as appropriate, after the system life cycle
14  cards
Chapter 5.7 Measurement Process
Collect, analyze, and report data relating to the products developed and processes implemented with the organization, to support effective management of the processes, and to objectively demonstrate the quality of the products
21  cards
Chapter 6 Agreement Processes
Define the activities necessary to establish an agreement between two organizations
28  cards
Earned Value Management System (EVMS)
Learn the principles of earned value
28  cards

More about
systems engineering

  • Class purpose General learning

Learn faster with Brainscape on your web, iPhone, or Android device. Study Wade Flaming's Systems Engineering flashcards for their University of Texas in Arlington (UTA) class now!

How studying works.

Brainscape's adaptive web mobile flashcards system will drill you on your weaknesses, using a pattern guaranteed to help you learn more in less time.

Add your own flashcards.

Either request "Edit" access from the author, or make a copy of the class to edit as your own. And you can always create a totally new class of your own too!

What's Brainscape anyway?

Brainscape is a digital flashcards platform where you can find, create, share, and study any subject on the planet.

We use an adaptive study algorithm that is proven to help you learn faster and remember longer....

Looking for something else?

Engineering Systems
  • 2 decks
  • 43 flashcards
  • 1 learners
Decks: Diesel Engines, Lo2, And more!
Engineer
  • 14 decks
  • 454 flashcards
  • 35 learners
Decks: Apparatus Specs, Pump Testing, Maintenance Manual, And more!
Systems Nervous System
  • 48 decks
  • 1806 flashcards
  • 79 learners
Decks: Vision 1, Vision 2, Common Conditions Of The Eye, And more!
Make Flashcards