Training Fires MP202.14 Flashcards Preview

KC V 2 > Training Fires MP202.14 > Flashcards

Flashcards in Training Fires MP202.14 Deck (15)
Loading flashcards...
1
Q

The objective of a training fire is to provide What?

A

realistic fire ground training under actual fire conditions for recruit and uniformed firefighters while providing high levels of safety and minimizing risk to firefighters.

2
Q

What system will be employed at actual fire incidents will be Standard Operating Procedure at all structural training fires?

A

The Incident Command System

3
Q

Who is responsible for complying with burn permits as well as calling the Air Quality Division each morning the day of the burn?

A

The officer in charge

4
Q

All structural off-site burns require an asbestos survey and file within __ working days prior to schedule burn.

A

10

5
Q

Each RIC shall consist of a minimum of how many firefighters?
A company officer shall be in charge of each RIC unit.

A

3

6
Q

Fire Department personnel will not be permitted to operate on the _____ during active fire conditions in the building.

A

roof

7
Q

To reduce risk and assist with scene management, training fire participants shall be formed into individual companies of no more than __ members and supervised by a officer.

A

4

8
Q

Access to the training fire building will be controlled with What?

A

fire line tape.

9
Q

Required Fire Equipment and Companies
-how many sources of hydrant water supply shall be established?
.

A

2 separate

10
Q
  • Required Fire Equipment and Companies*
  • Attack lines shall be supplied by one pumper.
  • The RIC lines shall be supplied by what/who?
A

a second pumper.

11
Q
  • Starting the training Fire*

- What type of materials shall be used in live training fires?

A

Only Class A

12
Q
  • Starting the training Fire*

- Records and Reports shall be maintained on all live training fires for how many years?

A

2

13
Q

Off Site Burns

If What is determined to be greater that 1% the structure may not be used for ANY training?

A

asbestos

14
Q

Off Site Burns

If building is free of asbestos (<1%) NESHAP forms must be filed __ days prior to burn.

A

10

15
Q

Off Site Burns

Structures will be pre- _____ at the roof.

A

vented

Decks in KC V 2 Class (87):