Terp10 Flashcards Preview

Strategic Management > Terp10 > Flashcards

Flashcards in Terp10 Deck (148)
Loading flashcards...
121

In the corrective management process, which phase is after the control phase?

Execution

122

Name two reference objects for which a maintenance notification can be created

Functional location ( with or without an assembly)

Equipment (with or without an assembly)

123

Name three elements included in a maintenance order

Order operation

Settlement rule

Object list

124

A non stock item is assigned to a maintenance order, the order is released..what is created

A purchase requisition

125

Which step comes after creating the purchase order in the non stock material procurement process flow?

Goods receipt

126

Which of the following activities can be performed after you release a maintenance order?
- print shop papers
- post goods issue
- Release payment for goods
- enter time confirmations

Print shop papers
Post goods issue
Enter time confirmations

127

Name two items used to confirm the time required to work on a maintenance order.

Individual entry
Overall completion confirmation

128

Name two ways a maintenance order can be completed

Complete the maintenance order and notification separately

Complete the maintenance order together with assigned notifications

129

An action log displays changes to what four things in chronological order?

Notifications
Orders
Functional locations
Equipment

130

What data can be found in the maintenance history of equipment? (2)

Order data

Data from maintenance notifications

131

The purpose of a work breakdown structure (WBS) is what (2)

To show the project activities to be fulfilled

To give a clear picture of the project

132

T/F
A project definition represents the hierarchical structure of a project

False

133

What describes the various steps and work involved in the project?

Network activity

134

Name two types of network activities

Internal

External

135

T/F
Within the project planning board you Cain plan, check or change dates

True

136

T/F
In projects with networks, the activity dates and WBS element dates can be derived automatically using the scheduling function.

True

137

Both stock and non stock items can be planned in a project. What type of document does the system create when a stock item is assigned to a project?

Reservation

138

While ounces to an activity, a work center is used to carry out which 3 tasks?

Produce work output

Perform scheduling

Perform capacity planning

139

T/F
When you plan dates and resources in network activities, the system automatically determines the corresponding planned costs as part of the network costing

True

140

What checks the assigned find against the budget?

Availability control

141

T/F
A cross application time sheet (CATS) is an integrated function for entering the actual time when recording the progress of a report.

True

142

What reports and systems are available for cross project evaluations to analyze the progress of the project?(3)

Project summarization

Executive information system

Profit center accounting reports

143

Name two actions that post actual costs to a project

Posting a goods receipt

Entering confirmation

144

While creating materials management transactions, the network generates a ___________ for external processing activities, and it is then passed on to the purchasing department for further processing.

Purchase requisition

145

Name two things that can be assigned to a network activity

A purchase requisition

A material component

146

T/F
Actual and plan revenues can be posted to a network activity

False

147

Name to period end closing activities for a project

A settlement

Results analysis

148

In what application is expense entered and posted to a project?

Financial accounting