Standard drop zones for Computed Air Release Point (CARP) Operations Flashcards Preview

JUMPMASTER BRAGG 2018 > Standard drop zones for Computed Air Release Point (CARP) Operations > Flashcards

Flashcards in Standard drop zones for Computed Air Release Point (CARP) Operations Deck (9)
Loading flashcards...
1
Q

The CARP is plotted by the ______

A

navigator

2
Q

CARP

A

Computed Air Release Point

3
Q

PPI

A

Personnel Point of Impact

4
Q

HEPI

A

Heavy Equipment Point of Impact

5
Q

Personnel planning drop altitude is

A

1,000 feet above ground level

6
Q

Personnel planning airdrop speed is

A

130 knots

7
Q

CDS and Heavy Equipment Planning drop altitude is

A

1,100 feet above ground level.

8
Q

CDS and Heavy Equipment planning airdrop airspeed is

A

140 knots

9
Q

Minimum Size Drop Zone requirements

A
  1. Personnel is 600 yards wide by 600 yards long
  2. Heavy Equipment is 600 yards wide by 1,000 yards long
  3. CDS refer to AFI 13-217 to determine the minimum size drop zone