The item number on the DA Form 5988 is where the _______ item number that applies to the fault
PMCS
When submitting a maintenance request, the piece of equipment won’t be accepted until this is filled in: ____________
Accepted by and status
When filling out a 5988 is must have:
Miles / KM
Hours
1st operators signature
When will a WARNO be issued?
After the PL determines a platoons mission and time for planning
What is included in Step 6 of the TLP?
The commanders intent and platoons intent put into an OPORD
What is included step 1 in the TLP?
Determining the units mission METT- TC
What is the only form authorized to record operators qualifications?
DA Form 348
What is the DA Form 5987-E-1?
Alert motor Equipment dispatch
What is the Roll and cross roll of the AMG?
+/- .5 degrees roll
+/- 10 degrees cross roll
What is the minimum and max distance from the RS to local LS?
120 M - 1200M
What is the distance of the TFOCA II?
500 m
What is the area required to emplace a launcher?
6 M - 15 M
What is the distance of all launchers?
Local LS: 120 M -1200M
RL 1: 1200 M - 10 Km
RL 3: 6 km - 30 KM
What is the PTL of local launchers and RL 1 and RL 3 launchers?
Local: +/- 80 degrees
RL 1: +/- 60 degrees
RL 3: +/- 60 degrees
What degrees of elevation impeded missile acquisition?
RS to LS: exceeding 2.0 degrees (local)
RL 1 and RL 3: exceeding 0.5 degrees (remote)
What are the 5 paragraphs of an OPORD?
Situation Mission Execution Sustainment Command and signal
Which paragraph of an OPORD includes the 5 W’s?
Para 2
Mission
What is included in step 8 (supervise and refine) in TLP?
PCCs / PCIs
True or False: after PMCS the crew chief or supervisor will verify that admin data is correct
False: supervisors must verify admin data prior to execution of PMCS DA PAM 750-8
What is included in paragraph 2 of an OPORD?
Mission essential task and 5 Ws
What happens in step 3 of TLP?
Developing a plan in a time constrained environment (make a tentative plan)
True or False: In step 3 of TLP, the PL will develop COAs and select the best one to execute
False: only 1 COA will be developed
Why is MX documentation critical?
Training cannot happen if mission essential equipment is NMC
Which level of MX is closely associated with these obsolete levels of MX “direct and organizational”?
Field
Why is table 1 of gunnery used?
To train Crew members on the fundamentals of patriot and Table 1 uses PMCS
What is the purpose of a DA Form 5988 and 2404?
To document all the MX an operator performs on a piece of equipment
The item number of the 5988 is where the ________ Item number applies to the fault described in the equipment TM.
PMCS
Services that are due on a certain day get this much variance:
10% variance
Fire control equipment is constrained to what size of an area and slope for emplacement?
30 M x 35 M
+/- 10 degrees slope
What is the max distance of emplacement for an RL 3 launcher?
30 K
Local launchers may be utilized to engage targets that are located:
+/- 80 degrees of the radar PTL
Which form is used to record ISLB?
DA Form 7616-R
What are the methods of manual orientation?
Map
Modified survey
Survey
WARNOs are based on 2 major variables:
Information available
SPINS
What does the RSOP minimum consist of?
RSOP OIC and NCOIC
And 8 team members
How many phases of RSOP are evaluated?
4
What are the types of RECON for RSOP?
Map
Ground
Air
How many team members are recommended for RSOP?
15
Minimum = 10
The acquisition clearance angle for local and remote launchers are:
Local LS: 2.0 degrees
Remote LS: .5 degrees
What is included in a WARNO?
- Type of operation
- General location of the operation
- Initial operation timeline
- Recon to initiate
- Movement to initiate
- Planning and preparing instructions
- Info requirements
- Commanders info requirements
Which level of MX is Most closely associated with organizational and direct support?
Field
Which level of MX is most closely associated with general support and depot level mx?
Sustainment
What’s the purpose of the DA Form 2404 and 5988?
- Faults found during services
- Actions taken during services
- Faults and repairs required for estimated damage
- BDAR performed