GM 806 Flashcards Preview

General Manual > GM 806 > Flashcards

Flashcards in GM 806 Deck (13)
Loading flashcards...
1
Q

Mobilization phase 1 is implemented for an unusual occurrence when the total manpower and resources assigned to the on-duty patrol division cannot:a) Control the occurrenceb) ———to other sections of the cityc) conclude the occurrence within a reasonable length of time

A

Provide adequate coverage

2
Q

Mobilization phase 1 is implemented for an unusual occurrence when the total manpower and resources assigned to the on-duty patrol division cannot:a) Control the occurrenceb) provide adequate coverage to other sections of the cityc)

A

Conclude the occurrence within a reasonable length of time

3
Q

Mobilization phase 1 – – – is established and the necessary radio frequencies are assigned and dedicated specifically for the unusual occurrence operations

A

Field command post

4
Q

Implementation of phase 1 mobilization is initiated by the command officer who was notified and responded. Notice of phase 1 implementation is made to who?a) The deputy chief assigned to patrol divisionb) – – – Or in his absence

A

Chief of police for in his absence the acting chief of police

5
Q

Implementation of phase 1 mobilization is initiated by the command officer who was notified and responded. Notice of phase 1 implementation is made to who?a) The ——assigned to ——b) chief of police or in his absence the acting chief of police

A

The deputy chief assigned to patrol divisions

6
Q

Phase 2 mobilization All – – –, – – –, – – – are canceled excluding injury and sick leave

A

Leave, training and support activities

7
Q

Mobilization recall The notification message shall be formatted to inform the member of the phase status, brief description of the unusual occurrence, the required equipment, and the location and time to report for assignment. Phase 1 the incident commander notifies the ————– of the personnel designated to recall

A

On duty communications unit shift supervisor

8
Q

Mobilization recall phase 1 the communications unit shift supervisor notifies the office of the chief, Deputy chief assigned to patrol division and – – –

A

Emergency management coordinator

9
Q

Mobilization recall phase 2 and phase 3The office of the chief notifies – – – and – – –

A

Office of the city manager and mayor

10
Q

Mobilization recall the incident commander ensures the recalled members receive specific assignments. Assignments are prioritized and given at the staging area. Assignments may be divided into four categories:1)Relief of on-duty members2) containment at the scene or control of the perimeter surrounding the occurrence3) provide – – – to other sections of the city4)assignments involving specialized needs are coordinated with the appropriate specialized unit commander

A

Service coverage

11
Q

Mobilization recall The incident commander determines the need for a 12 hour shift operation.12 hour shifts are identified as follows: the first shift is – – – the second shift is – –

A

Alpha Bravo

12
Q

T or FThe incident commander may request television and radio stations to assist in the recall of personnel for mobilization.

A

True

13
Q

Mobilization phase 1 is implemented for an unusual occurrence when the total manpower and resources assigned to the on-duty patrol division cannot:a) Cb) provide adequate coverage to other sections of the cityc) conclude the occurrence within a reasonable length of time

A

Control the occurrence