Chapter 38 Flashcards Preview

Software Project Management - CS615 > Chapter 38 > Flashcards

Flashcards in Chapter 38 Deck (13)
Loading flashcards...
1
Q

Is process of creating gantt chart manual

A

Yes

2
Q

What are 2 network-scheduling techniques

A
  1. PERT

2. CPM

3
Q

How we analyze the inter dependencies of tasks

A

Using network-scheduling techniques

4
Q

What are activities

A

Activities are the basic building blocks of network schedules

5
Q

What is float period in activity

A

Float is an amount of time by which an activity may be delayed without affecting the completion date of entire project.

6
Q

What is tail node

A

Where activity starts

7
Q

What is head node

A

Where activity ends

8
Q

What is network

A

A network is a graphical representation of activity and project

9
Q

What is critical path

A

It has those activities that can not be run concurrent.

10
Q

What is the longest path in network

A

Critical path. So it is the maximum duration of a project

11
Q

What are the rules for network schedule

A
  • Each activity has a preceding and succeeding node
  • Each node has a distinct number
  • Network schedule has no loop
12
Q

What is the shortest time an activity can take

A

optimistic time

13
Q

What is the longest time an activity can take

A

pessimistic time