Min clr floor space for 1 wheelchair

30x48

1

Look @ occupancy chart

Will do

2

Occupancy load factors are based on

Net or gross floor area, depending on occupancy group

3

Max distance object may protrude into path of travel

4"

4

Duck size designations use ___ 1st and ____ second

Width by depth

5

The standard for exit width requirement is

.2 inches per person

6

An exit door must have a clear width of at least

32 inches

7

Height of the handrail for barrier free design

34 to 38 inches , measured from the nosing of the stair

8

1:12 ramp max rise is

30 in

9

1:8 ramp maximum rise

3 inches

10

Normal sequence of drawings

Site plan, civil, architectural, structural, mechanical, plumbing, electrical

11

The design strength of the final mix of concrete is determined after

28 days

12

Requires a material or product to be compliant with an independent testing

Reference specification

13

Defines the standard scope of services

B141

14

Bricklaying. One course has short sides next course has long sides

English bond

15

Bricklaying: each rack alternates longside short side and each course centers on the next

Flemish bond

16

Addenda are issued

Prior to bid

17

Quest for substitution must be received ___ days before the bid date

10

18

- change order
- construction change directive
- written order for minor change
- written amendment to the contract signed by both parties

Modification

19

- Acts on behalf of the principal to perform certain duties to third-party
- can legally bind principal

Agent

20

Contractor is an example of a

- Vendor
- supplies a specific product at a fixed price

21

Fast track
One part needs to start before the other ones are designed

Many prime contract

22

Advantages of using a CM

Early advice on constructibility
Early cost estimating/value analysis
Project scheduling
Professional management of multiple contracts
* in some cases guaranteed maximum price/completion date

23

Disadvantages of CM

Extra costs
More complicated management structure

24

A.k.a. stipulated sum/lump sum
Owner not responsible for cost overruns
Owner sees no savings if it comes in under budget

Fixed price

25

Price guaranteed by contractor
Owner see savings if project comes in under budget

GMP

26

Cost-plus fee

Actual cost
Plus fees set before contract signing

27

Design build

O + 1 entity design and construction
* May hire architects as subcontractors
* maybe a joint venture between A/C
* May subcontract both A/C

28

Advantages of design build

Single source of responsibility
Owner has fixed-price early
Total time usually reduced

29

Disadvantages of design build

- Owner has less control over design
Can be disagreements about what is included
- Design build firm has control over material quality & construction methods
- To get what's needed, client must develop specific performance requirements