1

B101

O/A agreement

2

B101 divides architectural services into two groups

basic
additional

3

B102 separates for the specialist

agreement _ B102
services _ B201

4

Standard of Care

service consistent w/ level of skill and care ordinarily provides under similar circumstances

5

basic conversation req'd with O @ SD phase

sustainable design
Note: additional services = additional $

6

Instruments of Service

- no liability if drawings are used out of contract
- O pays licensing fee for continued use

7

B 103 _ O/A for Large/Complex Projects

- no cost estimate
b/c assumes 3rd party estimator for $ + schedule
- b/c fast track / phased / accelerated schedule
- A agrees to design to budget @ conclusion of DD phase

8

B 104 _ O/A Limited Scope

- abbreviated version
- 3 phases _ Design, CD's, C
- w/ A 107 _ SFA O/C for project w limited scope

9

B 105 _ Residential / Small Commercial

- brief duration
- 2 pg doc
- w/ A105 O/C
- O provides cost estimating through C
- A retains ownership of Instruments of Service

10

min. Insurance required of A

- general liability
- automobile
- workers comp
- professional liability

11

consultant services included in Basic Services

- structural
- mechanical
- electrical

12

A is entitled to rely on

information from O & O's consultants

13

A submits schedule to O for

approval of A's services

14

A's schedule will include

anticipated dates of construction

Note: times are not binding but assumptions.

15

A's schedule informs O

O's decisions are needed in a timely manner to keep schedule

16

A's schedule may extend

w/ O's approval

17

responsibility of filing docs w authorities

O w/ assistance of A

18

Preliminary Design services

- review program / O info / regulations
- prepare prelim eval of schedule / budget / site / delivery method
- notify owner of inconstancies
and consulting services for the project
- prepare prelim design for O's approval

19

Multiple Prime Contracts

- 1 / + Constructors employed under separate contracts
- Work either in a sequence or coincidentally

20

before advancing to next stage or design A must

get approval of O

21

Fast track projects will often reference these documents as part of contract docs

DD

22

Addenda

before signing contract, during bidding

23

A's construction phase services

award of contract for construction
through
issue of final certificate for payment

24

Inspection

more detailed evaluation than site visit

25

Punch list: prepared by

prepared by C, supplemented by A

26

Retainage for work performed is released @

substantial completion

27

Within 1 yr from substantial completion, A/O meet to review:

A / O meet to review facility operations / performance
w/o additional compensation

Note: may lead to post-occupancy services

28

Additional services section of contract needs to be completed before

agreement is exectued

29

List of additional services

Programming
Multiple Preliminary Designs
Measured Drawings
Existing facilities surveys
Site Eval + Planning (B203)
BIM
Civil Engineering
Landscape Design
Architectural Interior Design (B252)
Value Analysis
Detailed cost estimating
On-site project represtentaion
Conformed construction docs
As-designed record drawings
As-constructed record drawings
Post occupancy eval
Facility Support services (B210)
Tenant related services
Coordination of O's consultants
Telecommunications / data design
Security evaluation and planning (B206)
Commissioning (B211)
Extensive environmentally responsible design
LEED certification B214
Fast-track design services
Historic Preservation (B205)
FFE (Fixture, Furnishings + Equipement) Design B253
Other

30

FFE

Fixture, Furnishings + Equipment