13. Water shuttle operations Flashcards Preview

*IFSTA Pumping > 13. Water shuttle operations > Flashcards

Flashcards in 13. Water shuttle operations Deck (5)
Loading flashcards...
1

In accordance with NFPA 1901, water tenders must be designed to be filled at a rate of at least ___ GPM.

1000 gpm

2

A __ route is that optimum arrangement for a water shuttle circuit.

Circular

3

$$$

Commonly, water tenders have at least __ 2 1/2 inch direct tank fill connections or one LDH direct tank fill connection on the rear of the apparatus.

2

4

Any tank should be set up on a surface that is as level as possible and have a capacity at least __ gallons larger than the water tank on the apparatus that will supply it.

500 gallons

5

The dump site pumper should utilize a low level strainer to allow for continuous drafting to a point of about __ inches.

2 inches